← تازہ ترین جابز پر واپس جائیں
Mitsubishi Power Saudi Arabia

Unpack rotor and other small parts. Apply mask to rotor before blast cleaning according to established procedure. Blast cleaning operation (In the blast booth, wearing blast suit and respirator). Rotate the rotor in the blast booth by human power together with co-workers. Give direction to crane operator about handling of rotor. Operate forklift. Carry-in/out the rotor to/from the blast booth. Safety monitoring of blast cleaning operator from outside of blast booth. Collect blast media (grass beads) in the blast booth in order to recycle them. Keep inside and outside of blast booth clean. Dispose dust discharged from a dust collection system of blast facilities. Familiar with using inside outside micrometer and able to measure rotor and its components accurately. Familiar with using vernier caliper. Perform stacking and uninstalling of impeller to/from the compressor shaft by shrink fitting method with supervision. Perform run out correction of impeller with supervision. Remove and re-assemble small parts of rotor with supervision. Remove and re-assemble coupling hub and thrust disc by hydro fitting method. Perform balding work of turbine rotor under the supervision of expert. Perform dynamic balancing of rotor and components of rotor using balancing machine. Measure the inside diameter of heated impeller smoothly and quickly using inside micrometer before shrink fitting. Measure the surface temperature of heated impeller using contact thermometer. Perform cleaning and hand finishing of rotor and its components. Install dummy shaft into impeller before impeller solo balancing. Remove dummy shaft from impeller after impeller solo balancing. Perform unbalance correction of impeller using grinder. Raise rotor up/down in cooperation with crane operator. Check level of impeller and its table before stacking. Measure the gap using feeler gauge. Smooth en up corrosion, dent marks, scratches, stripes and scales of rotor. Apply short term rust preventive oil during works. Apply long term rust preventive oil before shipment. Perform packing work according to established procedures. Perform routine maintenance tasks on blast machine, VTL, CNC lathe, and balancing machine. Maintain a clean and organized work area. Perform UN-balding and balding onto GT rotor. Perform coupling blued check of rotor.

Mitsubishi Power Saudi Arabia Dammam, Saudi Arabia, Pakistan آخری تاریخ 11/1/2026

(تازہ ترین نوکریاں، سلیبس اور ٹیسٹ کی تیاری کی مکمل معلومات)

تیاری کر رہے ہیں

1180

دورانیہ

Permanent

فوکس ایریاز

Mechanical MaintenanceTurbine RepairMachinery OperationPrecision Measurement

People Also Ask (FAQs)

Mechanical Fitter کے لیے اپلائی کرنے کی آخری تاریخ کیا ہے؟

سرکاری آخری تاریخ 2026-11-01 ہے۔ آخری دنوں کے پورٹل رش سے بچنے کے لیے پہلے اپلائی کریں۔

Mechanical Fitter کے لیے اپلائی کیسے کریں؟

اس صفحے پر دیے گئے سرکاری Apply لنک سے درخواست جمع کریں۔ مرحلہ وار گائیڈ کے لیے اس نوکری کی how-to-apply گائیڈ دیکھیں۔

کیا Mitsubishi Power Saudi Arabia ٹیسٹ میں منفی مارکنگ ہے؟

مارکنگ کا اصول ہر ٹیسٹ کے اشتہار اور رول نمبر سلپ کی ہدایات میں بتایا جاتا ہے۔ بہت سے MCQ اسکریننگ ٹیسٹوں میں منفی مارکنگ نہیں ہوتی، مگر ہمیشہ اپنے ٹیسٹ کے لیے تصدیق کریں۔

پاس ہونے کے لیے کتنے نمبر درکار ہیں؟

پاسنگ عام طور پر ۵۰٪ ہوتی ہے، مگر میرٹ مقابلے کا ہے — انٹرویو کال کے لیے ۷۵٪ سے زیادہ اسکور محفوظ ہدف ہے۔

Mechanical Fitter ٹیسٹ کی تیاری کیسے کروں؟

PrepPro Academy پر مفت مضمون وار MCQs، پرانے پرچے اور وقت کے موک ٹیسٹ سے تیاری کریں — ہر سوال جواب اور وضاحت کے ساتھ ہے۔ توجہ کے مضامین: Mechanical Maintenance، Turbine Repair، Machinery Operation، Precision Measurement۔

فوری آغاز

جاب کا خلاصہ دیکھیں، پھر وہی فلو استعمال کرتے ہوئے تیاری شروع کریں جو امتحان شروع کرنے کے لیے استعمال ہوتا ہے۔

Prepare for this test

ہم کوکیز استعمال کرتے ہیں

ہم پلیٹ فارم کو چلانے کے لیے ضروری کوکیز اور استعمال سمجھنے کے لیے analytics کوکیز استعمال کرتے ہیں۔ آپ analytics اور advertising کوکیز قبول یا رد کر سکتے ہیں۔